How to calculate primary consolidation settlement
Primary consolidation settlement is how much a saturated clay thins as pore water drains under a load that stays. This free guide is that hand calculation in US customary units: feet, pcf, psf, and inches.
What you are calculating
The pore water carries the new load first. As it drains, the clay skeleton takes the load and the layer compresses. That is primary consolidation. Immediate settlement of sand, and secondary compression after the excess pore pressure is gone, are different numbers. Leave creep out of this result unless you label it.
You need H in feet, Cc, Cr, and e0 from a consolidation test (all three dimensionless), the existing effective stress, and the stress increase from the footing, mat, or fill, in psf. How long it takes depends on Cv. The simple consolidation analysis guide covers that curve, t50, and t90.
Effective stress and the stress increase
Use effective stress. Above the water table, moist unit weight times thickness. Below it, buoyant unit weight: saturated unit weight minus 62.4 pcf. Take the existing stress σ′0 and the increase Δσ at mid-clay, in psf. Then σ′f = σ′0 + Δσ.
Under the center of a rectangle B by L (feet) at net pressure q (psf), the 2:1 spread at depth z (feet) is:
Δσ = q · B · L / ((B + z)(L + z))
An average over the spread area, not the peak under the center. B, L, and z are in feet. q and Δσ are in psf.Boussinesq under the center is higher; Westergaard, which assumes no sideways strain, is usually lower there than Boussinesq. The vertical stress guide has the factors. A 2:1 hand number and a Boussinesq run often disagree, including in Eng-Tips threads, because each follows from its stress assumption. Say which you used. For an embedded footing, subtract the soil removed to foundation depth. A surface load has nothing to subtract.
The three equations
σ′p is the highest effective stress the clay has already carried, and OCR = σ′p / σ′0. The log is base 10. H in feet gives feet; multiply by 12 for inches. If the lab quoted strain ratios, Cεc = Cc/(1+e0) and Cεr = Cr/(1+e0) replace the fractions below.
δc = [Cc / (1 + e0)] · H · log10(σ′f / σ′0)
δc = [Cr / (1 + e0)] · H · log10(σ′f / σ′0)
δc = [Cr / (1 + e0)] · H · log10(σ′p / σ′0) + [Cc / (1 + e0)] · H · log10(σ′f / σ′p)
OCR = 1 uses the first equation. Reloading that stays below σ′p uses the second. Crossing σ′p uses Cr on the way up and Cc after that.
Worked example: 20 ft footing, 10 ft of clay
A 20 ft by 20 ft flexible footing applies a net pressure of 1,800 psf at the ground surface. From 0 to 5 ft the soil is sand at a moist unit weight of 120 pcf. Groundwater is at 5 ft. From 5 to 15 ft the soil is clay, 10 ft thick, with a saturated unit weight of 122.4 pcf, Cc = 0.28, Cr = 0.04, and e0 = 0.90. Find the primary consolidation settlement under the center. The sand is here only for the overburden; its own immediate settlement is not part of this number.
The buoyant unit weight of the clay is 122.4 − 62.4 = 60.0 pcf. At mid-clay, 10 ft deep:
σ′0 = 120 × 5 + 60 × 5 = 600 + 300 = 900 psf
The 2:1 increase at 10 ft, with B = L = 20 ft so that B + z = 30 ft:
Δσ = 1,800 × 20 × 20 / (30 × 30) = 720,000 / 900 = 800 psf
σ′f = 900 + 800 = 1,700 psf
For OCR = 1 the whole increment is on Cc. Cr is not used.
Cc / (1 + e0) = 0.28 / 1.90 = 0.147368
log10(1,700 / 900) = log10(1.8889) = 0.276206
δc = 0.147368 × 10 × 0.276206 = 0.4070 ft × 12 = 4.88 in
The same stresses with a different stress history:
- OCR = 2, so σ′p = 1,800 psf, which is still above 1,700 psf. The path stays on Cr. Cr / (1 + e0) = 0.04 / 1.90 = 0.021053, and 0.021053 × 10 × 0.276206 × 12 = 0.70 in.
- OCR = 1.5, so σ′p = 1,350 psf, between 900 and 1,700. log10(1,350/900) = 0.176091 and log10(1,700/1,350) = 0.100115, so 0.021053 × 10 × 0.176091 + 0.147368 × 10 × 0.100115 = 0.1846 ft = 2.22 in.
Five 2 ft slices, with σ′0 and the 2:1 increase recomputed at each mid-depth, raise the normally consolidated result from 4.88 in to 5.12 in. Boussinesq on those slices is 6.89 in under the center. Westergaard at Poisson's ratio 0 is 5.29 in. Same compression equation, different Δσ. The figures use the stress equations in CalcGeo's consolidation applet.
Common mistakes
- Natural log instead of log10. ln(1,700 / 900) = 0.636. The same normally consolidated arithmetic then gives about 11.2 in, more than double.
- Moist unit weight below the water table. That inflates σ′0, shrinks the stress ratio, and underestimates settlement. Use γsat − 62.4 pcf below groundwater.
- Cc when the final stress is still below σ′p. That path is Cr. In the example, OCR 2 is 0.70 in, not 4.88 in.
- Δσ at the top of a thick clay, applied to the full thickness. The increase is largest there. Use mid-layer for a hand check, or more than one slice.
- Gross pressure of an embedded footing. Subtract the soil removed to foundation depth. The clay compresses under the net increase.
Run the same profile in CalcGeo
The consolidation settlement applet runs this for rectangular loads in US units: Boussinesq, Westergaard, or 2:1, Cc/Cr with e0 or the strain ratios, and OCR or σ′p in psf. Settlement is in inches.
The result is approximate. A one-dimensional lab curve and a flexible load are built in. Verify it with another method and with engineering judgment before it goes in a report. Secondary compression, vertical drains, and staged loading are not in this calculation.
Open the consolidation settlement app
All-Access is $9/month or $89/year with a 3-day free trial (auto-renews; card required). See subscription terms. Cancel anytime from Account.
Frequently asked questions
How do you calculate primary consolidation settlement?
Add the stress increase to the existing effective stress. If the clay is normally consolidated, or already past the preconsolidation pressure, settlement is Cc/(1+e0) times thickness times the base-10 log of final over initial effective stress. Use Cr when the final stress stays at or below the preconsolidation pressure. If the load crosses that pressure, use Cr up to it and Cc after it. Thickness in feet gives settlement in feet; multiply by 12 for inches.
When do you use Cr instead of Cc?
Use Cr below the preconsolidation pressure and Cc on the virgin curve. The same 800 psf increase in the worked example gives 4.88 inches at OCR = 1 and 0.70 inches at OCR = 2.
Is a 2:1 stress increase the same as Boussinesq?
No. The 2:1 value under the center is the contact pressure times the footing area, divided by the spread area (B+z) by (L+z). Boussinesq at that point is higher. The example is 4.88 inches by one-point 2:1 and 6.89 inches by Boussinesq on five sublayers.
Does this calculation tell you how long settlement takes?
No. Cc and Cr are the settlement after excess pore pressure has dissipated. The time comes from the coefficient of consolidation, Cv, and the drainage distance. That curve is in the simple consolidation analysis guide.
Can this result go straight into a report?
No. The result is approximate. Check it with another method and with engineering judgment, and say whether you used 2:1, Boussinesq, or Westergaard. On this example a mid-layer 2:1 check is 4.88 inches; five sublayers give 5.12 inches by 2:1 and 6.89 inches by Boussinesq.