Consolidation Settlement with Surcharge Analysis
Estimate immediate and primary consolidation settlement under mats, footings and fills, then the time rate of consolidation from Cv. Up to 50 rectangular loads, 50 soil layers and 100 inspection points, with Boussinesq or Westergaard stress and mat foundation settlement reported as a subgrade modulus in pci.
What it does
- Up to 50 uniform rectangular loads, entered by the lower-left corner X, Y and B × L, in psf, each with its own foundation depth (net pressure applied at the base). Overlapping loads add.
- Boussinesq or Westergaard stress distribution, chosen with one switch.
- Up to 50 soil layers by depth with total unit weight, and for each layer immediate settlement from Es and Poisson's ratio (constrained modulus), or consolidation from Cc, Cr and e0 or strain-based Cεc and Cεr, with OCR or preconsolidation pressure and automatic sublayering.
- A single groundwater depth, with buoyant unit weights below it.
- Up to 100 inspection points with total, immediate and consolidation settlement and a per-layer breakdown, plus a true-scale plan view you can save as a PNG.
- Mat subgrade modulus: k in pci at each point under the mat from contact pressure divided by settlement, contoured over the mat.
- Time rate of consolidation: Terzaghi one-dimensional consolidation from Cv on each clay layer (ft²/year by default), single or double drainage, a degree-of-consolidation curve for each checked inspection point, and the days to 10, 25, 50, 75, 90, and 95 percent, including t50 and t90. Half-Cv and twice-Cv curves show a range of possible rate.
- Save and open project files, CSV export, and a draft report write-up for your use, written as the settlement section of a geotechnical report.
Mat subgrade modulus k
In mat foundation mode, k at each inspection point inside a loaded area is the contact pressure divided by the calculated total settlement, reported in pounds per cubic inch (pci) and contoured over the mat. For a public explainer of units, center-to-edge variation, and settlement-derived vs plate-load scaling, see the mat k section of the consolidation guide.
Start using it
Start 3-day free trial, then $9/mo (auto-renews)
Automatic renewal: Card required. Your subscription renews automatically every month until you cancel. When the 3-day free trial ends, your card is charged $9/month, and again every month, unless you cancel before the trial ends. Price may change with advance notice. Cancel anytime online: sign in, click Account, then “Manage or cancel subscription.” Subscription terms.
Start 3-day free trial, then $89/yr (auto-renews)
Automatic renewal: Card required. Your subscription renews automatically every year until you cancel. When the 3-day free trial ends, your card is charged $89/year, and again every year, unless you cancel before the trial ends. Price may change with advance notice. Cancel anytime online: sign in, click Account, then “Manage or cancel subscription.” Subscription terms.
Other stress, footing, and drainage choices
Besides Boussinesq and Westergaard, the applet can use a 2:1 spread: at depth z a rectangle B by L becomes (B+z) by (L+z), and a long footing approaches the strip form qB/(B+z). Immediate settlement defaults to one-dimensional constrained compression, which suits mats and wide fills. An elastic footing option uses Steinbrenner (1934) with the Mayne and Poulos (1999) rigidity and embedment factors. Time rate defaults to each clay layer on its own. If two touching clays are both set to double drainage, the result warns that their contact is being treated as a drain. Solve clay stack together runs a coupled one-dimensional solution through contiguous clays, and a granular layer between them acts as a drain. Project files from before these choices still open.
Frequently asked questions
What does the consolidation settlement calculator do?
It estimates settlement at up to 100 inspection points under up to 50 uniform rectangular loads, each at the ground surface or at its own foundation depth. The stress increase below each point is calculated with Boussinesq or Westergaard elastic theory, and settlement is added up layer by layer: immediate (elastic) settlement in layers described by a modulus, and primary consolidation settlement in clay layers described by compression indices and stress history. With a coefficient of consolidation and drainage, it also estimates the time rate of primary consolidation.
How is the time rate of consolidation calculated?
The time rate of consolidation uses Terzaghi one-dimensional consolidation for primary consolidation settlement. Enter the coefficient of consolidation, Cv, on each clay layer. The default unit is square feet per year, and square feet per day is the other choice. Switching the unit converts the number so the rate stays the same. A year is 365.25 days, and the graph stays in days. Single drainage uses the full layer thickness as the drainage distance. Double drainage uses half of that thickness. For each inspection point you check, the applet plots degree of consolidation versus time and lists the days to reach 10, 25, 50, 75, 90, and 95 percent, including t50 and t90. Dashed curves at half the entered Cv and at twice that Cv show a range of possible rate. They are not a confidence band. Save Project File and Open Project File store those inputs.
Which consolidation parameters can I use?
Either the compression index Cc and recompression index Cr with the initial void ratio e0, or the strain-based compression ratio Cεc and recompression ratio Cεr. Stress history is entered as an overconsolidation ratio (OCR) or a preconsolidation pressure in psf. Normally consolidated, overconsolidated, and overconsolidated layers loaded past the preconsolidation pressure are all handled.
Should I use Boussinesq or Westergaard?
Boussinesq assumes a uniform, isotropic soil and is the usual choice. Westergaard assumes thin stiff horizontal layers that prevent lateral strain, as in varved clays or soils with sand seams, and gives lower stresses below the load. The calculator lets you switch between them to see the difference.
How is the mat subgrade modulus k calculated?
When Mat foundation is selected, k at each inspection point inside a loaded area is the contact pressure divided by the calculated total settlement, reported in pounds per cubic inch (pci). Points outside a loaded area have no k. The values are contoured over the mat so the structural engineer can see how k varies from the center to the edges and corners.
How is groundwater handled?
One groundwater depth is entered for the site. Total unit weights are used above it and buoyant unit weights below it to calculate the existing effective stress at the middle of each sublayer. The groundwater level is assumed to stay the same during and after loading.
What is not included?
Secondary compression (creep), vertical drains, staged loading, and the stiffness of the foundation are not modelled. A primary-consolidation time curve is drawn only for inspection points you check, and only where Cv and a drainage condition are entered. Cv defaults to square feet per year. Square feet per day remains available, and switching units converts the number so the physical rate does not change. A year is 365.25 days. Time stays in days. Dashed curves at half and twice that Cv show sensitivity to the rate. They are not a confidence band. Unchecked points stay in the settlement results. The settlement is that of a flexible load. Results are approximate and must be checked by a qualified, licensed engineer.
Learn more
Simple consolidation analysis (includes mat k) · How to calculate primary consolidation settlement · Consolidation Settlement with Surcharge Analysis: method explained (All-Access) · Vertical stress: Boussinesq vs. Westergaard · All tools