// guides · public
Pavement Condition Index, in the field
PCI is a 0–100 score of what you can see on the surface. It is not a measure of how much load the pavement can carry, how slippery it is, or how rough it rides under a profiler. A high score is not a safety clearance.
Two methods, not one
StreetSaver can run more than one distress protocol. That name is context: many pavement management programs store their surveys there. CalcGeo is not StreetSaver, and the two methods below are kept apart.
- ASTM D6433 uses 20 asphalt distresses and 19 jointed-concrete distresses. CalcGeo reads the deduct charts in the 2016 and 2018 editions. The 2007 edition still combines weathering and raveling and does not include the later same-distress check; that edition is not auto-scored here.
- MTC's modified set uses 8 asphalt distresses and 7 jointed-concrete distresses. The FHWA-HRT-21-041 workbook (MTC manuals of 2016) selects specific ASTM charts for those combined names: distortions on the corrugation chart, rutting and depression on the rutting chart, separate raveling and weathering charts, concrete patching on the large-patch chart, and spalling on the joint-spall chart. Field severity limits, especially rut depth, are the MTC limits, not the ASTM limits.
An older seven-distress asphalt sheet combines weathering and raveling on one chart. That is not the current eight-distress method, and this app does not score it with the split curves.
Matching the published FHWA examples checks this graph trace. It does not certify the current StreetSaver release, and exact parity has not been established. The correction step is versioned: ASTM counts deducts above 2 and iterates; older MTC training counted deducts above 5 once. Both numbers are shown on the MTC method. Where a curve is incomplete, the sample stays incomplete. No tail is invented.
Asphalt and concrete are not the same sheet
Asphalt (AC) distresses are areas in square feet or lengths in linear feet. Jointed concrete (PCC) distresses are counts of affected slabs. The sample area you type is the asphalt density area. Concrete density uses the slab count. US customary units are the default. A continuously reinforced pavement is outside the jointed-slab method described here.
A survey is not a deterioration curve
Pavement management sometimes plots PCI against age or traffic and calls that plot a pavement deterioration curve. The curve is a way to think about when pavement maintenance might be due. It is not something this survey calculates. The PCI calculator scores the totals you enter today. It does not fit a curve, predict a later PCI, or schedule maintenance.
What you enter
The app asks for the total already summed for that distress and severity. It does not ask for length times width.
- Asphalt area distresses: total square feet (or square metres).
- Cracks measured along their length: total linear feet (or metres). On the MTC method that is one row for longitudinal, transverse, edge, and reflection cracks.
- Concrete: the number of affected slabs, not the damaged area. The sample size is the number of slabs.
- On the MTC method, pothole area is part of high-severity alligator cracking, not a separate count.
Add the pieces in the field, then type the total. Keep your sketch and notes; the score uses the total only.
Before you walk
Work only with the agency's permission and a traffic plan. Wear high-visibility clothing. Do not step into live lanes to "feel" a bump. Do not call a wet, dark, or parked-over section distress-free. A measuring wheel, tape, 10-foot straightedge, and a crack scale are the usual tools. Check the wheel on a known distance.
Sample size is a choice you record. MTC sheets are often 1,000–4,000 ft², or the whole management section, and 10–30 slabs. ASTM's statistical sample is different and is not the same thing as "10 percent." One casual spot is not a section PCI unless you say that is all you inspected.
Using the applet
Choose the method first. Enter the project number (the example default is 1111-1), the sample's total size, and one row per distress and severity. Calculate. Use Save Project File if you will come back, and Open Project File to load that same JSON. The section step area-weights the samples you add. Print or export CSV for the file. The condition scale on the sheet follows the method you selected. ASTM names and MTC names are not the same bands.
The paid article walks through every distress: what to include, what not to double-count, and the worked FHWA examples. Open the measurement article (All-Access). Open the calculator. Calculator details and FAQ.
Questions
Is PCI the same thing as a pavement deterioration curve?
No. PCI is the 0 to 100 score from one visual survey. A pavement deterioration curve is a later plot of those scores against age or traffic, used in pavement management to think about pavement maintenance. This guide and the calculator do not fit that curve or forecast a future PCI.
Does this guide match StreetSaver?
No. StreetSaver is named here because many agencies store PCI surveys in it and because its rater pages describe the current 8 and 7 distress names. CalcGeo is not affiliated with StreetSaver, MTC, or ASTM, and it is not a certified or guaranteed match to a current StreetSaver release.
Sources
- ASTM D6433-16 and D6433-18, Standard Practice for Roads and Parking Lots Pavement Condition Index Surveys.
- FHWA-HRT-21-041 (2021), Present Serviceability Rating Computation from Reported Distresses, including Tables 8–15 and Illustrations 1–4.
- Shahin and Kohn, USACE CERL Technical Report M-294 (1981), for the original q > 5 correction. That rule is not the ASTM iteration.
- StreetSaver rater-certification pages for the current 8 / 7 catalog and manual editions (asphalt 5th, March 2022; concrete 4th, March 2018). Those manuals were not used as curve sheets in this build.